Approval Date Type of Cover ² Country Title Sector Export Goods Delivery Value (CHF m) ³ Tenor ⁴ Exporter Category Remarks
Reset filter
15-06-17 S Iran Water Pipeline from Persian Gulf Region Infrastructure Delivery of motors, drives and power distribution 15 ST -
15-06-17 P Brazil Corcovado Infrastructure Delivery of three rack rail trains 24 ST -
16-06-17 B Bangladesh Soya bean hot dehulling plant Agribusiness / Food Production Soya bean hot dehulling plant 26 MLT -
16-06-17 S Azerbaijan Mill and Pasta Lines Agribusiness / Food Production Durum wheat mill / pasta short goods line / pasta long goods line / pasta regrind 11 MLT -
06-07-17 B Türkiye - Mining - 45 ST

-

- Footnote 1
06-07-17 S Ukraine Aerospace Industry Infrastructure Different Machine Tools 28 MLT

-

-
20-07-17 S United Arab Emirates Transport Industry Infrastructure Ship unloader 12 ST

-

-
26-07-17 B United States AMBT USA General Manufacturing Laser Welding Systems 34 MLT

-

-
26-07-17 S Czech Republic Tram Ostrava 26-40 Infrastructure 15 Trams 18 MLT

-

-
02-08-17 B Türkiye Spinning Industry General Manufacturing Spinning Machines 15 MLT

-

-
04-08-17 S France Nantes Métropole Infrastructure 20 electronic trolley busses 33 MLT

-

-
15-08-17 CB Indonesia - Infrastructure - 30 MLT

-

- Footnote 1
16-08-17 S Côte d’Ivoire Ayame/Taabo Hydroelectric Power Plant Power Rehabilitation Works 30 MLT

-

-
18-08-17 S Mali Sélingue Hydro Electric Power Plant Power Rehabilitation Works 39 MLT

-

-
28-08-17 WC Sweden Transport Industry Infrastructure - 12 ST

-

-
07-09-17 S India - General Manufacturing - 29 MLT

-

- Footnote 1
12-09-17 S Czech Republic Tram Ostrava 1-25 Infrastructure 25 Trams 18 MLT

-

-
26-09-17 S Türkiye Textile Industry General Manufacturing Textile Machines 18 MLT

-

-
26-09-17 B Bangladesh - General Manufacturing - 29 MLT

-

- Footnote 1
26-09-17 S Ecuador - Infrastructure - 78 MLT

-

- Footnote 1

1 The exporter declined to give us permission to publish information, usually because of competition but also because of security reasons and confidentiality agreements signed.
2 S = supplier credit insurance, B = buyer credit insurance, P = pre-shipment risk insurance, CB = contract bond insurance, C = confiscation risk insurance, WC = working capital insurance, CG = counter guarantee, RG = refinancing guarantee, LC = letter of credit confirmation insurance
3 The delivery value may not be equal to SERV’s exposure.
4 ST = short-term (< 24 months), MLT = medium/long-term (≥ 24 months)